Wes Harper and his crew completed the maintenance on the waterfall about 9 PM Tuesday night–on schedule.
Wes said they cleaned out about an inch of debris from the bottom basin which was blocking the intake of the pump. The flow over the spillway was much better when I drove by this morning.
They also cleaned out the upper basin and stream during this maintenance.
Leave a Reply